Trane 4TEE3D Wiring - http://www.hvacmechanic.com/ Forums


Original message

BKraengel

74.178.224.239

"Trane 4TEE3D Wiring" , posted Mon 11 Aug 11:48user profileedit/delete messagepost reply


Re: Trane 3H2C w/Elec Aux 4TEE3D Air Handler

All,

1. Is W2 the emergency heat relay? If aux heaters are staged (ODT between W1 & W2), does emergency heat kick in all stages simultaneously or are the heaters still staged?

2. What is YLO, is it first stage compressor (Y or Y1) or second stage compressor (Y2)?

3. What does the optional humidistat (between R & BK) do?

Bill Kraengel

 


Replies:

Houston204



98.196.66.53

"Re(1):Trane 4TEE3D Wiring" , posted Tue 12 Aug 08:16user profileedit/delete messagepost reply


They will not kick on simultaneously.

Ylo is a reduced fan speed terminal used only with the 19 seer 2 compressor systems. Y1 connects there with that system.

The BK jumper allows proper airflow for a humidifier to be used, although I cannot easily review this on the ipaq I'm using (compared to my dual monitor PC).

"Tip of the Day" Remember to remove power first.

 

 

BKraengel

74.235.154.104

"Re(2):Trane 4TEE3D Wiring" , posted Mon 13 Oct 13:52user profileedit/delete messagepost reply


Thanks Houston204. Where can I read up on the subject? I have an XL19i & 4TEE (3-ton) but there were no special hook-up instructions with it.

Bill Kraengel